Image 1 of 5
Image 2 of 5
Image 3 of 5
Image 4 of 5
Image 5 of 5
300 Rear End Package
Our 300 Rear End Package gives your bike a bold, wide tyre presence while maintaining stability and alignment. Engineered for strength, every component is precision machined to handle the load and torque of large rear wheels.
Perfect for street builds or show bikes, this kit delivers a seamless, aggressive look from wheel to swingarm.
Key features:
Heavy duty 300 mm MV-1 swingarm
Axle adjusters and spacers
Reinforced for wide tyre loads
Available in a raw or powdercoated finish
To suit 2007+ VROD models
Designed, precision machined, and quality checked in house
What’s included:
Swingarm
Crossmember
Pivot Support
All axle covers
Front and rear axle
Shock spacers and pillion peg spacers.
Offset front pulley
300 NRS style rim
All hardware and fitment components needed for install.
For a full front to rear build we also recommend:
NRS Wheel + Rake Kit & Fork Sleeves Package
Pulley or Chain drive kit
Front fender extension (23″ / 26″)
Lead Time: 1-4 weeks depending on finish & machining schedule.
Our 300 Rear End Package gives your bike a bold, wide tyre presence while maintaining stability and alignment. Engineered for strength, every component is precision machined to handle the load and torque of large rear wheels.
Perfect for street builds or show bikes, this kit delivers a seamless, aggressive look from wheel to swingarm.
Key features:
Heavy duty 300 mm MV-1 swingarm
Axle adjusters and spacers
Reinforced for wide tyre loads
Available in a raw or powdercoated finish
To suit 2007+ VROD models
Designed, precision machined, and quality checked in house
What’s included:
Swingarm
Crossmember
Pivot Support
All axle covers
Front and rear axle
Shock spacers and pillion peg spacers.
Offset front pulley
300 NRS style rim
All hardware and fitment components needed for install.
For a full front to rear build we also recommend:
NRS Wheel + Rake Kit & Fork Sleeves Package
Pulley or Chain drive kit
Front fender extension (23″ / 26″)
Lead Time: 1-4 weeks depending on finish & machining schedule.